After measuring 15 times and cutting twice; without a level wall, a level floor, or sometimes even level brick, Chris has a fireplace ready for the tile guys. They are supposed to come this week so hopefully by Friday we will have a final product post. Thank you Chris!!!
Monday, January 28, 2008
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment